Project Category: Automation Projects

Fire & Gas Alarm Detection System for Fertilizer Plant.

Fire & Gas Alarm Detection System for Fertilizer Plant.

Description of Scope:

Design, construction, supply, testing and Vendor services for Fire & Gas Detection System based on Allen Bradley Control Logix 5000 PLC equipped with SAFCO addressable C-LIB card.

Project: Fire & Gas Alarm Detection System for Fertilizer Plant.

End User: Engro Fertilizer, Pakistan.

Year: 2009
Customer/ Main Contractor: Engro Fertilizer, Pakistan.

System: System consists of MFDAS (Master Fire Detection & Alarm System), which is responsible for communication with Process Control System

Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS), PGP (HMI), DSOE and Expansion.

Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS), PGP (HMI), DSOE and Expansion.

Description of Scope:

On-site Services for site survey and on-site erection/ commissioning plus warranty services:

Project: Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS), PGP (HMI), DSOE and Expansion.

End User: The Hub Power Station (323MW x 4 Units)

Year: 2006-8
Customer/ Main Contractor: ABB AG (PSP), Abu Dhabi – UAE.

System: Consists of five (5) C-net of Infi-90/ Harmony DCS.

Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS) and PGP (HMI)

Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS) and PGP (HMI)

Description of Scope:

On-site Services for site survey and on-site erection/ commissioning of ABB Harmony MPSIII (PS), Composer (EWS) and PGP (HMI – servers & clients) plus warranty services.

Project: Infi-90 DCS upgrade to Harmony MPSIII (PS), Composer (EWS) and PGP (HMI)

End User: TNB Liberty Power Station (220 MW Combined Cycle)

Year: 2007-8
Customer/ Main Contractor: ABB AG (PSP), Abu Dhabi – UAE.

System: ABB Harmony MPSIII (PS), Composer (EWS) and PGP (HMI)

BBC Decontec-K Control System replacement with ABB Symphony Plus DCS at BQPS-Unit-1.

BBC Decontec-K Control System replacement with ABB Symphony Plus DCS at BQPS-Unit-1.

Description of Scope:

Services of a Supervisor and 03 technicians to work under ABB Site Manager/ Lead Engineer for below Scope of Work with a team of 20+ technicians/ labors:

Project: BBC Decontec-K Control System replacement with ABB Symphony Plus DCS at BQPS-Unit-1.

End User: KE – BQPS/ Unit-1, Karachi

Year: 2017
Customer/ Main Contractor: Pulse Automation/ ABB IAPG Karachi

System: ABB Symphony Plus DCS for Power Generation (including Steam Turbine, Thermal Boiler and BoP), consists of 21 cabinets for Controllers & IOs, Marshalling and Servers.

ABB Infi-90 DCS modification (Addition of CIU node)

ABB Infi-90 DCS modification (Addition of CIU node)

Description of Scope:

Design/ engineering, procurement, system assembly, shop testing and erection/ commissioning at site; to change the Serial CIU interface to ICI03-SCSI interface for OPC scanner b/w Infi-90 C-Net and Experian (Honeywell) HMI servers.

Project: ABB Infi-90 DCS modification (Addition of CIU node)

End User: Engro Fertilizer – Pakistan.

Year: 2011-12
Customer/ Main Contractor: Engro Fertilizer – Pakistan (Direct Order)

System: ABB Infi-90 DCS

TLAS (Truck Loading) System

TLAS (Truck Loading) System

Description of Scope:

S7-400 Control system modification & commissioning to make TLAS fully functional/ running and reporting & logging creations in WinCC/TIA portal.

Project: TLAS (Truck Loading) System

End User: OMV Pakistan (Mehar Oil Field)

Year: 2017-18
Customer/ Main Contractor: ARK Engineering, Ajman, UAE

System: Siemens S7-400 PLC and TIA Portal

Replacement of ABB Infi-90 DCS with Yokogawa Centum VP DCS at QP/ Kathya Field

Replacement of ABB Infi-90 DCS with Yokogawa Centum VP DCS at QP/ Kathya Field

Description of Scope:

Review/ study of Infi-90 DCS configuration (consists of Infi-90 rack system hardware, Win tools (EWS) and OIS43 (HMI) to provide following engineering inputs for system replacement: 

Project: Replacement of ABB Infi-90 DCS with Yokogawa Centum VP DCS at QP/ Kathya Field

End User: Qatar Petroleum

Year: 2011
Customer/ Main Contractor: Micromedia LLC, Sharjah UAE/ Yokogawa ME (Bahrain).

System: ABB Infi-90 DCS, Win tools (EWS) and OIS43 (HMI)

ABB PPB (HMI) upgrade to ABB 800xA 6.0.3 at QP-NGL4 plant

ABB PPB (HMI) upgrade to ABB 800xA 6.0.3 at QP-NGL4 plant

Description of Scope: 

In-house work at MDI E&C office:

  • Development of soft simulation in EWS-Composer 5.0 project for 7800 tags (Data acquisition and Digital/ Analog Control Loops). 
  • Installation & setup of EWS-Composer and PPB workstations with re-storing of existing NGL-4 configuration

Project: ABB PPB (HMI) upgrade to ABB 800xA 6.0.3 at QP-NGL4 plant

End User: Qatar Petroleum

Year: 2016-17

Customer/ Main Contractor: Process FZE/ ABB IAOG UAE

System: ABB Harmony, Composer (EWS), PPB 2.0 (HMI) and 800xA 6.0.3 (HMI)

ABB DCS 800xA Warranty Services

ABB DCS 800xA Warranty Services

Description of Scope:

To maintain ABB DCS Communication with existing GE Ovation, Emerson and Siemens.
ABB Instruments diagnosis and calibration.

Project: ABB DCS 800xA Warranty Services

End User: Saudi Electric Company Southern Region

Year: 2018-20

Customer/ Main Contractor: ABB IAPG KSA/ ABB Electrical Industries Co. Ltd KSA

System: ABB 800xA 5.0.1, AC 800M, PGIM